International Fireproof Technology Inc.
Linkedin Facebook Twitter Blog Youtube

DC315 For Spray Foam

Building Code Fire Performance Requirements for SPF: The International Building Code (IBC) mandates that SPF be separated from the interior of the building by a 15-minute thermal barrier, or other approved covering. DC315 Carries Intertek CCRR-1076, IAMPO ER-0499 and ICC-ES ESR-3702 Evaluation Reports confirm that DC315 meets IBC and IRC Code Requirements. DC315 has also been tested as an ignition barrier under AC 377 Appendix X.

DC315 now is 115 Square Feet Per Gallon click here for more Information!!


DC315 Thermal & Ignition Barrier Testing Matrix – Approved Foams, Coverage Rates and Evaluation Reports

DC 315 Thermal and Ignition Barrier Coating

DC315 Evaluation Reports

DC315 For Spray Foam

Application Documents

Help Documents

Youtube How To Videos

Technical Documents

        Become or Find a Certified Applicator

Application Documents in Spanish

DC315 Performance Testing